[poll] Vehicle Tracking using GPS
Tue Sep 07 2010, 07:18 pm
I will put some more light on the working of GPS part.
GPS normally factory configured to send 5 messages every 1 second. SIRF 3 compliant GPS can be configured to send selected messages and also at selected time. time can vary from 1s to 255 seconds or to turn off that message.
as you need only one kind of message GPRMC, so you can turn off all other messages.
The GPS spec you have posted is fine. you can go ahead an buy it.
regarding controller. DS89C450 is best for your project, It has 2 uarts and single cycle instructions very fast. you can make use of software uart for debugging incase you want. or simply LED based debug. connect 8 LEDs on a port that defines different status of your program, its easiest way of debugging and you can even debug if your PC or laptop is not available.
PS: I was out on weekend so couldnt reply
GPS normally factory configured to send 5 messages every 1 second. SIRF 3 compliant GPS can be configured to send selected messages and also at selected time. time can vary from 1s to 255 seconds or to turn off that message.
as you need only one kind of message GPRMC, so you can turn off all other messages.
The GPS spec you have posted is fine. you can go ahead an buy it.
regarding controller. DS89C450 is best for your project, It has 2 uarts and single cycle instructions very fast. you can make use of software uart for debugging incase you want. or simply LED based debug. connect 8 LEDs on a port that defines different status of your program, its easiest way of debugging and you can even debug if your PC or laptop is not available.
PS: I was out on weekend so couldnt reply
Tue Sep 07 2010, 08:41 pm
DS89C450 instead of this shouldnt i go for AT89C51RE2. As it has enuf memory and ISP,SPI too
Tue Sep 07 2010, 09:16 pm
do you need SPI in this project? i dont think so.
you need uart only. ad DS89C450 is also SPI, 64K ROM with 1K ram. sufficient for your project.
RE2 does have more memory but i dont think your program will reach that much limit.
check for prices before using any of the controller.
you need uart only. ad DS89C450 is also SPI, 64K ROM with 1K ram. sufficient for your project.
RE2 does have more memory but i dont think your program will reach that much limit.
check for prices before using any of the controller.
Fri Sep 17 2010, 07:02 pm
""SiRF Technology Inc. does not support magnetic declination. All “course over ground†data are geodetic WGS48 directions."""
What does this statement mean
What does this statement mean
Sat Sep 18 2010, 09:25 pm
Course over ground is direction of motion in degrees with respect to north.
Magnetic Declination is angle between North and needle of compass.
WGS48? well i guess its WGS84 must have been misprinted or something.
WGS84 (World Geodesy System 84) is a Geodesy technique to find out angle according to latitude and longitude. you can do search on wikipedia or google for more information on this.
Magnetic Declination is angle between North and needle of compass.
WGS48? well i guess its WGS84 must have been misprinted or something.
WGS84 (World Geodesy System 84) is a Geodesy technique to find out angle according to latitude and longitude. you can do search on wikipedia or google for more information on this.
Tue Oct 12 2010, 12:36 am
hey ajay,
when are we starting to work with PC languages as u said i.e PHP and all
when are we starting to work with PC languages as u said i.e PHP and all
Tue Oct 12 2010, 01:25 am
hi shirazi, long time since i hear from u
well i am all ready.. tell me when to start.
give me the data format which you're going to send to server.
well i am all ready.. tell me when to start.
give me the data format which you're going to send to server.
Wed Oct 13 2010, 01:22 am
hey ajay,
thnx man, but there is some slight abeyance in the development of the project because of my exams. My 7th sem exams are about to commence so i would be free after 20th dec. Henceforth i would again continue with the proj.
Is it alright with you?
thnx man, but there is some slight abeyance in the development of the project because of my exams. My 7th sem exams are about to commence so i would be free after 20th dec. Henceforth i would again continue with the proj.
Is it alright with you?
Powered by e107 Forum System